Cement Grinding Capacity Expansion (Project BISTAAR-2013/14)

Project Name : Cement Grinding Capacity Expansion (Project BISTAAR-2013/14)
Supplier Name : ENEXCO BEUMER GROUP
Client Name : Holcim Bangladesh Ltd.
Location of the Project : Meghnaghat, Narayangonj, Dhaka, Bangladesh.
Status of the Project : COMPLETED
Scope of the Work : In January 2013 we started the BISTAAR project. ENEXCO BEUMER GROUP was the supplier of all materials. We handled both packing section and grinding section of this project. The scope of works up to:
1. Erection of pre fabricated Steel structure.
2. All equipment installation including packing plant,
3.Pipe line fitting,
4.Sheeting,
5.Painting,
6.All electrical work etc.

Installation of ID Fan at HBL (Bistaar Project)
1. Liner & Media- 500 MT, Supplied by AIA Engineering
2. Bearing – Supplied by SKF
3. Bucket elevator-Three(03 Nos.) belt buckets & 2 chain buckets elevator supplied by ENEXCO BEUMER GROUP
4. Main motor- 23000 KW, Supplied by Bharat heavy electrical Ltd(BHEL)
5. Gear box, all motor – Supplied by Siemens Germany.
6. Separator- ENEXCO BEUMER GROUP
7. RC fan- Supplied REITZ
8. Rotor Packer-Twelve (12) nozzlepacking machine, Supplied by ENEXCO BEUMER GROUP

In the end of the year 2013, project BISTAAR came to end. Cement mill rolled out and the cement commenced successfully. Mill ran with 110 TPH in full capacity.

Project Images